Work No. 14H—Realignment of Fairbourne Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 50 metres south of its junction with the A20 (Ashford Road), passing southwards over the railway and terminating at a point 45 metres south of the northern end of the bridge carrying that road over the M20;

Work No. 14J—Diversion of the Bell Farm access from Sandway Road, Harrietsham, commencing by a junction with Sandway Road at a point 130 metres south-east of its junction with East Street, passing south-eastwards, then south-westwards and southwards under the railway (Work No. 14) and terminating in that access road at a point 35 metres south of the northern end of the subway by which it passes under the M20;

Work No. 14K—Realignment of Runham Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 60 metres south-west of its junction with Sandway Road, passing south-westwards over the railway and terminating in Runham Lane at a point 10 metres south-west of the north-eastern end of the bridge carrying that road over the M20;

Work No. 14L—Diversion of Sandway Road (C92), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres south-east of its junction with Runham Lane, passing south-eastwards on the eastern side of Sandway Road, then southwards over the railway and terminating in that road at a point 190 metres north-west of its junction with Old Ham Lane;

Work No. 14M—Diversion of Old Ham Lane (D986), including a bridge over the railway (Work No. 14), commencing in that road at a point 360 metres north of its junction with Sandway Road and Lenham Heath Road, passing southwards over the railway and terminating in Old Ham Lane at that road junction;

Work No. 14N—Realignment of Headcorn Road commencing in that road at a point 220 metres north-east of its junction with Lenham Heath Road, passing south-westwards over the railway (Work No. 14) in tunnel and terminating in Headcorn Road at a point 130 metres north-east of that road junction;

Work No. 14P—Realignment of Boughton Road, including a bridge over the railway (Work No. 14) commencing in that road at a point 140 metres north of its junction with Lenham Heath Road, passing southwards over the railway and terminating in Boughton Road at a point 70 metres north of that road junction;

Work No. 14Q—Diversion of Lenham Heath Road (C92) at Sandway, including a bridge over the railway (Work No. 14), commencing in that road at a point 225 metres south-east of its junction with Boughton Road, passing south-eastwards then north-eastwards over the railway, then south-eastwards and eastwards and terminating in Lenham Heath Road at a point 590 metres north-west of its existing junction with Bowley Lane;

Work No. 14R—Diversion of Lenham Heath Road (C92) at Chapel Mill commencing in that road at a point 260 metres north-west of its existing junction with Bowley Lane, passing south-eastwards over the Great Stour River and terminating in Lenham Heath Road at a point 310 metres south-east of that existing road junction, including a bridge over the Great Stour River;

Work No. 14S—Diversion of Bowley Lane at its junction with Lenham Heath Road, including bridges over the railway (Work No. 14) and the M20, commencing by a junction with Lenham Heath Road (Work No. 14R) at a point 225 metres south-east of the commencement of that work, passing southwards and south-westwards, over the railway and the motorway, and terminating in Bowley Lane at a point 165 metres south of the southern end of the existing bridge carrying that road over the M20;

Work No. 14T—An access road, for construction purposes, commencing by a junction with the eastbound carriageway of the M20 at a point 75 metres north-west of the western side of the existing bridge carrying Bowley Lane over the motorway, passing south-eastwards and eastwards to a point on the southern side of the railway (Work No. 14) 220 metres south-east of the intended bridge carrying that road over the railway, then passing southwards and south-eastwards and terminating by a junction with that carriageway of the M20 at a point 210 metres north-west of the western side of the bridge carrying Hubbard’s Farm access road over the motorway;

Work No. 14U—An access road on the line of Hubbard’s Farm access road west of Hook Street, including a bridge over the railway (Work No. 14), commencing by a junction with Lenham Heath Road at a point 75 metres west of its junction with Bull Hill, passing southwards over the railway and terminating in the existing access road at the southern end of the bridge carrying it over the M20;

Work No. 14V—An access road on the southern side of the railway (Work No. 14) commencing in the curtilage of Old Cottage, passing south-eastwards to a junction with the new road (Work No. 14U) at a point 120 metres south of its commencement, then continuing south-eastwards and terminating in the curtilage of Yew Tree Cottage off Hook Street (to be stopped up);

In the borough of Maidstone, parish of Lenham, and in the borough of Ashford, town of Ashford and parishes of Charing, Hothfield and Westwell, in the county of Kent—

Lenham Heath to Ashford Barracks

Work No. 15—A railway (11,342 metres in length) commencing by a junction with the railway (Work No. 14) at its termination, passing south-eastwards under Egerton Road (Work No. 15C), Newlands Road (Work No. 15F) and Pluckley Road (Work No. 15G), passing eastwards in tunnel for a distance of 115 metres beneath Leacon Lane (Work No. 15J), and under the A20 (Maidstone Road) (Work No. 15K) then continuing south-eastwards over the M20 at a point 50 metres west of the bridge carrying the Maidstone and Ashford Railway over the motorway at Tutt Hill, passing under Westwell Lane (Work No. 15M) and over Station Road (Work No. 15N), under the A20 (Work No. 15P) and over Godinton Lane (Work No. 15Q) and terminating at a point in Rowcroft Barracks 530 metres north-west of the existing junction of Godinton Road with Chart Road, including bridges over the M20, Station Road and Godinton Lane;

Work No. 15A—A railway (2,576 metres in length) on the northern side of the railway (Work No. 15) commencing by a junction with that railway at a point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at a point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;

Work No. 15B—A railway (2,576 metres in length) on the southern side of the railway (Work No. 15) commencing by a junction with that railway at the said point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at the said point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;

Work No. 15C—Realignment of Egerton Road, including a bridge over the railways (Works Nos. 15, 15A and 15B), commencing in that road at a point 5 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards over those railways and terminating in Egerton Road at a point 130 metres north-east of its junction with Vicarage Lane;

Work No. 15D—Realignment of Vicarage Lane commencing in that road at a point 65 metres north of its junction with Egerton Road and terminating at that road junction;

Work No. 15E—Diversion of Hurst Lane (D1198) at its junction with Newlands Road commencing in Hurst Lane at a point 260 metres north-west of that existing road junction, passing eastwards and terminating by a junction with Newlands Road (Work No. 15F) at a point 75 metres north of the said existing road junction;

Work No. 15F—Realignment of Newlands Road (D1199), including a bridge over the railway (Work No. 15), commencing in that road at a point 15 metres north of the northern abutment of the bridge carrying that road over the M20, passing northwards over the railway, then north-eastwards and terminating in Newlands Road at a point 135 metres north-east of its junction with Hurst Lane;

Work No. 15G—Realignment of Pluckley Road (C493), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards and northwards over the motorway and the railway and terminating in Pluckley Road at a point 65 metres north of its existing junction with Leacon Lane;

Work No. 15H—Diversion of Leacon Lane between Pluckley Road and Leacon Alders commencing by a junction with Pluckley Road at its existing junction with Leacon Lane, passing eastwards then south-eastwards under the railway (Work No. 15) and terminating in Leacon Lane at a point 195 metres west of the bridge carrying that road over the stream at Leacon Alders, including access to Oakover Nursery and Raywood Cottages and to the emergency access to the M20;

Work No. 15J—Realignment of Leacon Lane east of Leacon Alders commencing in that road at a point 240 metres east of its junction with Hurstford Lane, passing north-eastwards over the railway (Work No. 15) in tunnel, and terminating in Leacon Lane at a point 200 metres south-west of its junction with the A20 (Maidstone Road);

Work No. 15K—Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres north of its junction with Leacon Lane, passing south-eastwards over the railway on the western side of the existing road and terminating in the A20 at the north-western end of the bridge carrying that road over the M20, including access to Leda Cottages at a point 35 metres north-west of that termination;

Work No. 15L—A road for access to premises on the eastern side of the existing A20 commencing by a junction with the A20 (Work No. 15K) at a point on its eastern side 205 metres south-east of its commencement, passing eastwards, then south-eastwards and terminating by a junction with the remaining part of the existing road at a point 285 metres south-east of the commencement of Work No. 15K;

Work No. 15M—Diversion of Westwell Lane (D1227) commencing in that road at the southern end of the bridge carrying it over the M20, passing southwards on the eastern side of the existing road, then south-westwards over the Maidstone and Ashford Railway and the railway (Work No. 15), then passing south-eastwards and southwards and terminating in that road at a point 180 metres south of the southern abutment of the existing bridge carrying that road over the Maidstone and Ashford Railway, including a bridge over that railway and Work No. 15;

Work No. 15N—Realignment of Station Road, Westwell, commencing in that road at a point 15 metres south-west of the bridge carrying the Maidstone and Ashford Railway over that road, passing south-westwards under the railway (Work No. 15) and terminating in Station Road at a point 220 metres south-west of that commencement;

Work No. 15P—Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 405 metres north-west of the entrance to Yonsea Farm, passing eastwards on the northern side of the existing road, over the railway, then south-eastwards and terminating in that road at a point at Potters Corner 25 metres south-east of the junction with that road of Godinton Lane;

Work No. 15Q—Diversion of Godinton Lane commencing in that road at a point 225 metres south-west of its junction with the A20, passing south-westwards on the western side of the existing road, under the railway (Work No. 15) and terminating in Godinton Lane at a point 10 metres north-east of the access to North Lodge;

In the borough of Ashford, town of Ashford and parish of Sevington, in the County of Kent—

Ashford Barracks to Sevington

Work No. 16—A railway (4,535 metres in length) commencing by a junction with the railway (Work No. 15) at its termination, passing south-eastwards to a point 130 metres north-west of the existing junction of Godinton Road with Chart Road, then in tunnel for a distance of 565 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), the railway (Work No. 16A) and the Maidstone and Ashford Railway (Work No. 16C), then under Beaver Road (Work No. 16N), over the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway and the railways (Works Nos. 16C and 16D), then over the railways (Works Nos. 16A and 16E), under Boys Hall Road (Work No. 16Q), and terminating at a point 225 metres west of the western side of the existing bridge carrying Bad Munstereifel Road over the Ashford and Folkestone Railway at Sevington, including bridges over Works Nos. 16A, 16C, 16D and 16E, the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway, and the Aylesford Stream (Work No. 16S);

Work No. 16A—A railway (4,555 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the northern side of that railway, in tunnel for a distance of 405 metres beneath Chart Road (Work No. 16F), then passing southwards over the railway (Work No. 16) in tunnel, then south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and the East Stour Rivers, under Work No. 16, and Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);

Work No. 16B—A railway (4,550 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the southern side of that railway, in tunnel for a distance of 475 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), passing south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers, under Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);

Work No. 16C—A railway (2,228 metres in length) commencing by a junction with the Maidstone and Ashford Railway at a point 200 metres north-west of the bridge carrying the Godinton Road over that railway, passing south-eastwards over the railway (Work No. 16) in tunnel, under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers and terminating by a junction with the Ashford and Canterbury Railway at a point 70 metres east of the intended bridge carrying Work No. 16 over that railway, including a bridge over Work No. 16K;

Work No. 16D—A railway (954 metres in length), forming sidings on the Ashford and Canterbury and Ashford and Folkestone Railways, commencing at a point 45 metres south-east of the eastern abutment of the bridge carrying that railway over the East Stour River, passing south-eastwards on the southern side of the railway (Work No. 16C) to a junction with the Ashford and Canterbury Railway, then passing eastwards under the railway (Work No. 16) then south-eastwards and terminating at a point 125 metres north-west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, including railway sidings;

Work No. 16E—A railway (748 metres in length) commencing by a junction with the railway (Work No. 16A) at a point 140 metres north-west of the intended bridge carrying the railway (Work No. 16) over that railway, passing south-eastwards under Work No. 16, on the northern side of Work No. 16A and terminating at a point 92 metres south-east of the eastern side of the existing Aylesford Place level crossing (to be stopped up), including railway sidings;

Work No. 16F—Realignment of the A28 (Chart Road) commencing in that road at a point 45 metres east of the junction of Hilton Road with that road, passing eastwards over the railways (Works Nos. 16, 16A and 16B) in tunnel and terminating in that road at a point 3 metres west of the western side of the bridge carrying the Maidstone and Ashford Railway over that road;

Work No. 16G—Realignment of Godinton Road (B2074) and Carlton Road (E1467) commencing by a junction with Chart Road (Work No. 16F) at the existing junction of that road with Godinton Road, passing south-eastwards on the line of that road over the railway (Work No. 16B) in tunnel, then passing south-westwards on the line of Carlton Road and terminating in that road at a point 63 metres south-west of its junction with Godinton Road;

Work No. 16H—A road commencing by a junction with Godinton Road (Work No. 16G) at a point 80 metres south-east of its existing junction with Chart Road, passing north-eastwards over the railways (Works Nos 16, 16A and 16B) in tunnel, then south-eastwards over the Maidstone and Ashford Railway (Work No. 16C) and terminating in Godinton Road at a point 45 metres north-west of its junction with James Street, including a bridge over the Maidstone and Ashford Railway (Work No. 16C);

Work No. 16J—Realignment of Bridge Road commencing in that road at a point 45 metres south-west of its existing junction with Godinton Road, passing north-eastwards, and terminating by a junction with Work No. 16G at that road junction;

Work No. 16K—An access road and cycle track commencing in Gasworks Lane at a point 30 metres south of its junction with the A292 (Elwick Road), passing south-westwards for a distance of 108 metres, on the western side of Gasworks Lane (to be stopped up), over the railway (Work No. 16), then continuing as a cycle track south-westwards, then eastwards and westwards, under the railways (Works Nos. 16A, 16B and 16C) and the Tonbridge and Ashford Railway, and terminating in Gasworks Lane at a point 10 metres south of the southern end of the existing bridge carrying that last mentioned railway over that road, including a bridge over Work No. 16;

Work No. 16L—A road commencing by a junction with Leacon Road at its junction with Norfolk Drive, passing eastwards and terminating by a junction with Gasworks Lane at a point 120 metres south of the southern end of the bridge carrying the Tonbridge and Ashford Railway over that road;

Work No. 16M—A cycle track commencing by a junction with the footpath AU 37 at a point 32 metres south of its junction with the A292 (Elwick Road), passing south-westwards over the railways (Works Nos. 16, 16A, 16B and 16C), the Maidstone and Ashford and the Tonbridge and Ashford Railways, then passing westwards, then eastwards and terminating by a junction with the footpath at a point 5 metres south-west of the southern end of the footbridge carrying that footpath over the Tonbridge and Ashford Railway;

Work No. 16N—Diversion of the A2070 (Beaver Road) commencing in that road at its junction with the A292 (Elwick Road and Station Road), passing southwards over the railways (Works Nos. 16, 16A, 16B and 16C) and terminating in the A2070 at its junction with the Romney Marsh Road, including a bridge over the said railways and a junction roundabout at that termination;

Work No. 16P—A cycle track commencing at the southern end of Alsops Road, passing eastwards, then westwards and eastwards, then southwards over the railways (Works Nos. 16, 16A and 16B) and the Ashford and Folkestone Railway, then continuing westwards and eastwards and terminating by a junction with Crowbridge Road at a point 60 metres west of the junction of that road with Gladstone Road;

Work No. 16QQ—Diversion of Boys Hall Road and Canterbury Road (E1466), including a bridge over the Ashford and Folkestone Railway in place of the existing bridge over that railway and over the railways (Works Nos. 16, 16A and 16B) and the new road (Work No. 16RR), commencing in Boys Hall Road at a point 215 metres north-east of the existing junction of Crowbridge Road with that road, passing south-westwards over Works Nos. 16, 16A and 16B, the Ashford and Folkestone Railway and Work No. 16RR on the eastern side of the existing road and terminating in Canterbury Road at a point 150 metres south-west of that existing road junction;

Work No. 16RR—A road, forming in part a realignment of Crowbridge Road (D4488), commencing in that road at a point 230 metres north-west of its existing junction with Canterbury Road, passing south-eastwards under Work No. 16QQ then passing southwards, south-westwards and south-eastwards and terminating at a roundabout in the northern corner of Orbital Park, Ashford, at a point 520 metres north-west of the junction of Bad Munstereifel Road (Work No. 17A) with the access road to Orbital Park, Ashford;

 

Work No. 16RR(1)—A road commencing by a junction with the new road (Work No. 16QQ) at a point 40 metres north-east of the junction of Mead Road with Canterbury Road, passing south-eastwards and terminating by a junction with Work No. 16RR at a point 120 metres south-east of that road junction;

Work No. 16S—A cut, forming a diversion of the Aylesford Stream, commencing in that stream at a point 185 metres upstream from the northern side of the bridge carrying the Ashford and Folkestone Railway over that stream, passing westwards under the railways (Works Nos. 16, 16A and 16B) and terminating in that stream at a point 5 metres north of the southern side of the said bridge;

Work No. 16T—A railway (1,201 metres in length), forming sidings, commencing by a junction with the Ashford to Canterbury Railway at a point 4 metres south of the southern side of the bridge carrying Hythe Road over that railway, passing southwards, westwards then north-westwards and terminating in the Ashford Goods Yard at a point 200 metres east of the south-western side of the bridge carrying the Ashford to Folkestone Railway over the East Stour river;

Work No. 16U—A railway (100 metres in length), forming a cross-over, commencing by a junction with the railway (Work No. 16E) at a point 60 metres west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, passing south-eastwards and terminating by a junction with the railway (Work No. 16A) at a point 85 metres south of that road junction;

In the borough of Ashford, parishes of Sevington, Mersham, Smeeth and Aldington, and in the district of Shepway, parishes of Sellindge, Stanford, Saltwood and Postling, in the county of Kent—

Work No. 17—A railway (12,300 metres in length) commencing by a junction with the railway (Work No. 16) at its termination, passing south-eastwards on the northern side of the Ashford and Folkestone Railway, under Bad Munstereifel Road (Work No. 17A) and Highfield Lane (Work No. 17C), over Blind Lane (Work No. 17D), then in tunnel beneath Church Road, Mersham for a distance of 160 metres, then passing eastwards, under Station Road, Smeeth (Work No. 17H), over Church Lane, Sellindge, (Work No. 17K), then on the southern side of the Sellindge Converter Station, under Harringe Lane (Work No. 17L), over the A20 (Ashford Road) at Sellindge (Work No. 17M) and the East Stour River west of Stone Street, Westenhanger, under the B2068 Link Road (Work No. 17P) and the A20 (Ashford Road) (Work No. 17Q) to a point alongside the western portal of the tunnel on the Ashford and Folkestone Railway beneath the access to Sandling Park, then in tunnel for a distance of 90 metres beneath that access and terminating at a point 427 metres east of the eastern portal of that tunnel at the access to Sandling Park, including bridges over Works Nos. 17D, 17K and 17M;

Work No. 17A—Realignment of Bad Munstereifel Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge over that railway, commencing in that road at a point 330 metres north-east of the north-eastern abutment of the said existing bridge passing south-westwards over the two railways and terminating in that road at a point 420 metres south-west of the south-western abutment of that existing bridge;

Work No. 17B—Diversion of Highfield Lane and Church Road north of the bridge carrying Highfield Lane over the Ashford and Folkestone Railway, commencing in Church Road at a point 260 metres south of its junction with Bad Munstereifel Road, passing southwards, then eastwards on the line of Church Road to its junction with Highfield Lane, then passing north-eastwards on the line of that road to a point 120 metres north-east of that road junction, then passing eastwards and terminating by a junction with Highfield Lane (Work No. 17C) at a point 120 metres south-west of the commencement of that work;

Work No. 17C—A new road, forming a diversion of Highfield Lane and Church Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying Highfield Lane over that railway, commencing by a junction with Highfield Lane at a point 260 metres north-east of its existing junction with Church Road, passing westwards, then south-westwards and southwards on the eastern side of the existing road, over the two railways, and terminating by a junction with Highfield Lane at a point 40 metres south of the access from that road to The Dean;

 

Work No. 17C(1)—A road for access to premises on the eastern side of Highfield Lane south of the Ashford and Folkestone Railway, commencing by a junction with the new road (Work No. 17C) at a point 100 metres north of the termination of that work, passing eastwards and terminating by a junction with the remaining part of Highfield Lane at a point 80 metres north of the access to The Dean;

Work No. 17D—Realignment of Blind Lane commencing in that road at a point 180 metres north-east of the existing bridge carrying the Ashford and Tonbridge Railway over that road, passing under that railway and the railway (Work No. 17) and terminating in Blind Lane at a point 90 metres south-west of the said existing bridge;

Work No. 17E—A tunnel over the Ashford and Folkestone Railway coterminous with the tunnel forming part of the railway (Work No. 17), beneath Church Road, Mersham (Work No. 17F);

Work No. 17F—A road, forming a diversion of Church Road, Mersham, commencing in that road at a point 240 metres south-west of its junction with Bower Road, passing south-westwards and southwards on the eastern side of the existing road, over the railway (Work No. 17) in tunnel and the Ashford and Folkestone Railway in tunnel (Work No. 17E), and terminating in Church Road at a point 190 metres north of its junction with Jemmett Lane;

Work No. 17G—A road for access to premises on the western side of Church Road, Mersham, north of the Ashford and Folkestone Railway, commencing in the remaining part of Church Road at a point opposite Bridge Cottage and terminating by a junction with Church Road (Work No. 17F) at a point 180 metres south-west of its commencement;

Work No. 17H—Diversion of the B2069 (Station Road, Smeeth), including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in Station Road at a point 260 metres south-west of the access to Park Wood Cottage, passing northwards on the western side of the existing road over the two railways, and terminating in Station Road at a point 130 metres north of the northern abutment of that existing bridge;

 

Work No. 17J(1)—A cut, forming a diversion of a tributary of the East Stour River west of Church Lane, Sellindge, commencing in that stream at a point 130 metres east of the northern end of the culvert by which it passes under the Ashford and Folkestone Railway, passing westwards, then southwards and terminating in that stream at a point 10 metres north of the northern end of that culvert;

Work No. 17J(2)—A cut, forming a diversion of the East Stour River, commencing in that river at a point 60 metres south-west of the southern end of the culvert by which that river passes under the Ashford and Folkestone Railway 290 metres east of Grove Bridge, passing eastwards then southwards and terminating in that river at a point 80 metres south of the southern end of the culvert by which that river passes under that railway 750 metres east of Grove Bridge;

Work No. 17J(3)—A cut, forming a diversion of the East Stour River at Westenhanger, commencing in that river at the northern end of the culvert by which that river passes under the Ashford and Folkestone Railway west of Stone Street, passing eastwards on the northern side of the railway (Work No. 17), and terminating in that river at a point 170 metres north-east of that commencement;

Work No. 17K—A diversion of Church Lane, Sellindge, commencing in that road at a point 20 metres north of the northern side of the existing bridge carrying the Ashford and Folkestone Railway over that road, passing south-eastwards under the railway (Work No. 17) and the Ashford and Folkestone Railway and terminating in Church Lane at a point 280 metres south of the southern side of that existing bridge;

Work No. 17L—A realignment of Harringe Lane, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at a point 50 metres north of the northern end of the bridge carrying that road over the M20, passing southwards over the motorway and over the two railways and terminating in Harringe Lane at a point 50 metres north of the bridge carrying that road over the East Stour River;

Work No. 17M—Realignment of the A20 (Ashford Road) at Sellindge commencing in that road at the southern side of the bridge carrying the M20 over that road, passing southwards on the line of the A20, under the railway (Work No. 17) and the Ashford and Folkestone Railway, and terminating in that road at a point 50 metres south of the southern side of the bridge carrying that last-mentioned railway over that road;

Work No. 17N—A road commencing by a junction with Stone Street at a point 80 metres west of the southern end of the bridge carrying the emergency services access road over the M20 at Stanford, passing south-eastwards then eastwards on the northern side of the railway (Work No. 17), then northwards, and terminating by a junction with the roundabout at Junction 11 of the M20 at a point 70 metres west of the junction with that roundabout of the westbound slip road of the B2068 Link Road;

Work No. 17P—Realignment of the B2068 Link Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at the existing junction of that road with the roundabout at Junction 11 of the M20, passing southwards over those two railways and terminating in that road at the existing roundabout at its junction with the A20 (Ashford Road);

Work No. 17Q—Diversion of the A20 (Ashford Road) at Sandling, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at the existing roundabout at its junction with the B2068 Link Road, passing north-eastwards over those two railways and terminating in that road at a point 220 metres north-east of the northern abutment of that existing bridge;

In the district of Shepway, parishes of Saltwood and Newington and town of Folkestone, in the county of Kent—

Saltwood to Folkestone

Work No. 18A—A railway (3,476 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards under Sandling Road (Work No. 18H) on the northern side of the Ashford and Folkestone Railway and the northern side of the Dollands Moor Freight Yard, then under the roundabout (part of Work No. 18J) and terminating at a point on the western side of the M20 at Newington 215 metres south-west of the junction of Newington Road with the A20;

Work No. 18AA—A railway (1,700 metres in length) commencing by a junction with the railway (Work No. 18A) at its termination, passing eastwards over the M20 and the A20 and an access road within the Channel Tunnel Terminal and terminating by a junction with the Eurotunnel Railway at a point 1,430 metres east of the western end of the bridge carrying that railway over the A20, including bridges over the M20, the A20 and the said access road;

Work No. 18B—A railway (4,400 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards on the northern side of the Ashford and Folkestone Railway, under Sandling Road (Work No. 18H), then over the Saltwood Tunnel on that railway, continuing on the southern side of that railway and the Dollands Moor Freight Yard, over the railway (Work No. 18E), under the B2065 (Hythe Road) (Work No. 18J), on existing bridges over the M20 and the A20 and terminating by a junction with the Eurotunnel Railway at a point 570 metres east of the eastern end of the bridge carrying that railway over the A20, including a bridge over Work No. 18E;

Work No. 18C—A railway (1,591 metres in length) commencing by a junction with the railway (Work No. 18B) at chainage 369 metres, passing eastwards on the southern side of the railway (Work No. 18A), then south-eastwards and terminating by a junction with the northern sidings of the Dollands Moor Freight Yard at a point 370 metres east of the eastern portal of the Saltwood Tunnel;

Work No. 18D—A railway (352 metres in length) commencing by a junction with the railway (Work No. 18A) at chainage 588 metres, passing eastwards and terminating by a junction with the railway (Work No. 18C) at chainage 571 metres;

Work No. 18E—A deviation railway (2,136 metres in length), forming a diversion of the Ashford and Folkestone Railway, commencing by a junction with that railway at the eastern portal of the Saltwood Tunnel, passing eastwards under the railway (Work No. 18B) and the B2065 (Hythe Road) (Work No. 18J) and terminating by a junction with the Ashford and Folkestone Railway at a point 470 metres west of the bridge carrying Cheriton High Street over that railway;

Work No. 18F—A railway (1,423 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 150 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J), and terminating by a junction with the Eurotunnel Railway at a point 365 metres east of the existing bridge carrying that road over the Dollands Moor Freight Yard;

Work No. 18G—A railway (1,272 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 750 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J) and terminating by a junction with the railway (Work No. 18B) at a point 90 metres east of the western end of the bridge carrying that railway over the M20;

Work No. 18H—Realignment of Sandling Road, including a bridge over the railways (Works Nos. 18A and 18B), commencing in that road at the bridge carrying that road over the Ashford and Folkestone Railway, passing north-westwards over those railways and terminating in Sandling Road at a point 140 metres south-east of the junction of that road with the A20 (Ashford Road), including a bridge over Works Nos. 18A and 18B;

Work No. 18J—Realignment of the B2065 (Hythe Road), including a roundabout at the junction of that road with the exit slip road from the Channel Tunnel Terminal (Work No. 18K) and bridges carrying that roundabout over the railway (Work No. 18A), commencing in the B2065 at a point 183 metres south of the centre of the roundabout at the Beechborough Cross Roads, passing southwards over Work No. 18A, then on viaduct over Dollands Moor Freight Yard and over the railways (Works Nos. 18B, 18E, 18F and 18G) and terminating in the B2065 at a point 215 metres north of its junction with the bridleway HE 260, including the said roundabout bridges and viaduct;

Work No. 18K—A road commencing by a junction with the north-eastern side of the roundabout (part of Work No. 18J), passing north-eastwards and eastwards and terminating by a junction with the exit slip road from the Channel Tunnel Terminal at a point 250 metres from the western end of the bridge carrying that road over the M20;

In the London Borough of Hammersmith and Fulham—

White City Sidings

Work No. 19—A railway (1,050 metres in length), forming a diversion of the northbound track of the West London Line between North Pole Junction and Kensington Olympia, commencing by a junction with that railway at a point 25 metres south-east of the bridge over that railway beneath Westway west of the junction of that road with West Cross Route, passing south-eastwards on the western side of that railway under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating by a junction with the West London Line at a point 170 metres north of the northern portal of the tunnel in which that railway passes beneath the junction of West Cross Route with Holland Park Avenue, Shepherds Bush Green and the Uxbridge Road;

Work No. 19A—A railway (715 metres in length), forming a siding of the West London Line, commencing by a junction with the railway (Work No. 19) at its commencement, passing south-eastwards on the eastern side of that railway, under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating at a point 258 metres south of the southern side of the said railway bridge;

In the borough of Gravesham, parishes of Shorne and Higham, in the county of Kent—

Hoo Sidings

Work No. 20A—A railway (1,111 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards on the northern side of that railway, then north-eastwards on the southern side of the Grain Branch of that railway and terminating at a point 120 metres south of the south-western abutment of the bridge carrying that railway over the former Thames and Medway Canal;

Work No. 20B—A railway (827 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards then south-eastwards on the southern side of that railway and terminating at the eastern end of the existing siding of that railway, including railway sidings;

In the districts of Dover and Thanet, parishes of Minster and Sandwich, in the county of Kent—

Richborough Sidings

Works No. 21—A railway (1,139 metres in length), forming sidings at the Richborough Power Station at Stonelees, commencing by a junction with the Margate and Dover Railway at a point 530 metres north-west of the north-western abutment of the bridge carrying that railway over the River Stour, passing south-eastwards and terminating at a point 470 metres west of the north-western end of the culvert carrying the A256 (Ramsgate Road) over Minster Stream, including railway sidings.

Interpretation

2 In paragraph 1 above—

  • references to the Tilbury Loop Railway are references to the Tilbury Line of the London Tilbury and Southend Railway;

  • references to the M2 and the M20 are references to the special roads so designated;

  • references to the A13 and the A20 are references to the trunk roads so designated and references to the intended A13 are to a new road to be constructed in substitution for part of the A13; and

  • “westbound” in any description of the direction of road or railway traffic signifies travel in the direction of London, whether or not London is the destination, and “eastbound” signifies travel in the opposite direction.